LNG Regasification Terminal in Malta

LOCATION

Delimara, Malta

CLIENT

J&P AVAX S.A.

COMPLETION DATE

December 2015

PROJECT VALUE

TBD

Detailed Construction Design of an LNG Regasification Terminal at Delimara, Malta.

Dr. Christos Solomonidis
Contact

SERVICES

  • Detailed Construction Design of the Jetty/ Central Loading Platform, the Mooring and Breasting Dolphins, the Walkway
  • Detailed Construction Design of the Erosion Protection System and the Retaining Wall
  • Static and Dynamic Analysis
  • Method Statement for the proposed works

KEY INFORMATION

  • Jetty trestle with length of 250 m., and width 6m.
  • Central Loading Platform with dimensions: 33 x 23m.
  • FSU – LNG Tanker
  • Three (3) breasting dolphins
  • Eight (8) mooring dolphins